If Projects are like cars and gasoline – what octane level of tools do you need?

Recently I had the opportunity to present at a conference of business professionals about project management tools. Unlike professional project managers, who have a background that encompasses many of the tools available to facilitate project management, this audience included practitioners across a wide spectrum of business areas. So, for that presentation, I wanted to talk about project management tools from the 50,000 foot level.

The metaphor I chose for the presentation was how to select the most appropriate project management tool octane in order to get the right balance of cost and power. There was a side benefit to the metaphor — some useful concept matching graphics; always a plus when your slides will be displayed on large projection screens. The take-away I was striving for was an appreciation that there is not the one best PM tool, but rather the PM needs to match tool capabilities to project size and complexity.

So, here is my “octane-based” categorization of projects:

 

Unleaded:

    • Small project with 3 to 10 staff
    • Short duration — between one and four months
    • Part-time project manager — 6-10 hours per week
    • Needs PM tools to develop and track
  • Charter and scope
  • Tasks and schedule
  • Status reports

Regular:

    • Dedicated staff of 10 to 30 people
    • Medium duration — usually less than one year
    • Half-time PM
    • Needs PM tools to develop and track
  • Charter and scope
  • Project plan
  • Schedule
  • Assignments
  • Risks and issues
  • Status reports

Super/Premium

    • Large, strategic project
    • 30+ full-time staff
    • Long duration — 12 to 24 months
    • Full time PM
    • Needs PM tools to develop and track
  • Charter and budget
  • Project management plan
  • Detailed schedule
  • Assignments
  • Risks and issues
  • Quality plan
  • Cost controls
  • Status reports with metrics

Over the next couple of weeks, I plan on talking about the type of PM tools that support the needs of each octane level of project. I will focus on commonly used PM tools. Some of my thoughts are based on the Resource Management survey conducted by Cognitive Technologies Inc., last year (Tools for Resource Management – The Survey Results).

Becoming a Logical Listener

April 2012 is going down in my project management record book as the busiest and most intense work weeks for as long as I can remember — and that is a good thing. To accommodate my over-flowing task schedule, I have asked a fellow PM and writer, Barbara Brown, to create this week’s post.

Thank you, Bruce. It is a pleasure to have the opportunity to share on a topic I have been thinking about recently – logical fallacies. I know that sounds arcane and academic. However, identifying fallacious arguments can sometimes help you win a contentious point in a business discussion. Or, at least, construct a masterful putdown when you are talking back to a radio or TV commentator.

N. B.: Keep in mind that few people appreciate having the logic of their conclusions questioned. Therefore, in many situations, it is best to keep your insights to yourself and use this knowledge only to improve the validity of your own arguments.

What is a logic fallacy?
Logic is about drawing justifiable conclusions from premises or data.  The prototypical example of deductive logical reasoning is: All men are mortal (premise1), Socrates is a man (premise 2); therefore Socrates is mortal (conclusion). In more normal conversation, however, the conclusions are often not clearly reachable from considering only the premises because — wait for it — the speaker engages in the use of logic fallacies. Here is an example:

(P1) Barack Obama was elected president in 2008;
(P2) The economy began falling apart in 2008; therefore
(C) Barack Obama caused the poor economic conditions.

This example shows a relatively common logical fallacy, especially in an election year, called: post hoc ergo propter hoc or just post hoc for short. This argument is fallacious because it assumes causality based solely on chronology.

Other Frequently Encountered Logic Fallacies
“Straw Man” The person presenting an argument with a “straw man” wants to appear as if he or she has considered the opposition’s arguments and can refute them. They accomplish this feat by selecting an exaggerated example supposedly from the other side, and then proceed to disprove the example. Sounds reasonable, doesn’t it. However, the trick to a “straw man” debate is that the person chooses a weak argument for the opposing side or misrepresents their position. Then, they ask you to conclude, in essence, if one of the opponent’s arguments can be so easily shown false, then all of their arguments are wrong, which is why this type of logical fallacy is also called, a fallacy of extension. Example:

Agile programming teams have no manager to lead them
Teams without a sense of direction or purpose are destined to fail
Therefore, developing software using agile methods will fail.

“False Dilemma” This logic fallacy uses an argument that assumes there are only two decision options, when in reality there are many options.

We have to choose between Microsoft Project and Primavera for our project management software.

“Slippery Slope” In this type of logical fallacy, if one accepts a slightly disagreeable action one must also accept that this will lead to increasingly bad events.

If Robert is not punished for failing to turn in his status report, then no one will feel compelled to report project status. Without status information, management will make poor decisions and projects will fail. If projects fail, the company will lose market share. If we lose market share, we will go bankrupted and we will all be without a job. Therefore, Robert must be fired.

“Complex Question” joins two premises (one, usually, unstated) as if they were one. This technique is often called, “asking a loaded question”. The logical fallacy is in the assumption that the two premises are linked. The complex question fallacy is committed when a question rests on an unproven assumption.

How do you expect to be an effective manager when you cannot get to work on time?

I know that dissecting discussions for their logical fallacies is not everyone’s cup of tea.  However, I confess that sometimes on the ride home from work through stop-and-go traffic, I have felt better about losing a contentious point when I can find the fallacy in my antagonist’s argument.

If you want to have some more fun with logic, you might enjoy listening to the LSAT Logic in Everyday Life podcasts.

Research Findings on the Characteristics of Successful Teams

 

If you are like me, you are an avid reader and always trying to learn from, others. For example,  I have found that often the advice on the characteristics of a successful team relies on observation and anecdotal evidence. So, I was interested in a recent article in Harvard Business Review that applied research discipline to the analysis of successful team behavior. Here is a summary of their process and findings. Original article by Alex “Sandy” Pentland, professor and director of MIT’s Human Dynamic Laboratory, Media Lab, Entrepreneurship Program and chairman of Sociometric Solutions. (“The Science of Building Great Teams”, Harvard Business Review, April 2012).

Believing that communication patterns, as opposed to content of communications, offer a window into successful and unsuccessful teams, Dr. Pentland’s research team selected and then monitored communication patterns in 21 organizations across multiple industry sectors including, innovation teams, customer-facing teams, personnel in a post-operative hospital setting, and backroom operations teams.

Each member of a team was outfitted with an electronic device to collect data on tone of voice, body language, how frequently they communicated and with whom the communication occurred. Badges, which generated more than 100 data points per minute, were worn for six weeks. (My first thought here was that this intrusiveness – wearing an electronic badge – would skew the data. However, the researcher’s observations and subject reports suggest that individuals desensitized to the device in about an hour.)

Significant Conclusion 1: The best predictor of productivity was the energy and engagement among team members outside of formal meetings. The engagement is not facilitated by off-sites and parties, but can be improved with areas set aside for informal conversation such as break areas, cafeterias and hallways.

Research results on communication style:

  • Team members communicate is rough equal proportions. Most communications among team members were short.
  • The communication style of successful teams was face-to-face and included frequent gesturing.
  • Team members communicate directly with one another, not just through the team or project manager.

Significant Conclusion 2: The most valuable form of communication is face-to-face. Least valuable forms are email and texting. Phone and video conferencing are okay, if there are not too many people. According to their data analysis, 35 percent of the variability in team performance can be accounted for just by counting face-to-face interactions.

Significant Conclusion 3: Effective teams have members who often engage in communication outside of the team with other teams or key players – bringing information and ideas back to the team.

Significant Conclusion 4: Team communication can be improved through training, feedback, modifications in the physical environment and management role models.

If you find interesting articles or readings please share with a comment.

 